Review 6 Elliot st - beacon hill - Welder / Boilermaker - Structural steel fabrication / Installation SWMS

Review the SWMS information below before signing this SWMS. If you see any issues or require clarifcation, please contact Jake | 0420772469 | jake@seasidebuilt.com.au.

Work details

Site / work area
6 Elliot st - beacon hill
Trade
Welder / Boilermaker
Task
Structural steel fabrication / Installation
HRCW categories
  • A person could fall more than 2m
  • There have been structural alterations that require temporary support to prevent collapse

Responsible person

Identified hazards and risks

  • Falls from steel structure
  • Steel members falling during installation
  • Burns and eye damage from welding
  • Crush injuries from steel handling

Risk control measures

  • Use harness system when working on structure
  • Brace members until connections complete
  • Full welding PPE for all welding
  • Stay clear of crane operations
  • Team handling for heavy steel

How controls will be implemented

  • Fall protection in place before climbing
  • Steel erection sequence followed
  • Crane exclusion zone enforced
Powered by