Review the SWMS information below before signing this SWMS. If you see any issues or require clarifcation, please contact Jake | 0420772469 | jake@seasidebuilt.com.au.
Work details
- Site / work area
- 6 Elliot st - beacon hill
- Trade
- Welder / Boilermaker
- Task
- Structural steel fabrication / Installation
- HRCW categories
- A person could fall more than 2m
- There have been structural alterations that require temporary support to prevent collapse
Responsible person
Identified hazards and risks
- Falls from steel structure
- Steel members falling during installation
- Burns and eye damage from welding
- Crush injuries from steel handling
Risk control measures
- Use harness system when working on structure
- Brace members until connections complete
- Full welding PPE for all welding
- Stay clear of crane operations
- Team handling for heavy steel
How controls will be implemented
- Fall protection in place before climbing
- Steel erection sequence followed
- Crane exclusion zone enforced